Galvani Business Center II

YEAR: 2004

LOCALIZATION: Galvaniho ul. Bratislava

ARCHITECT: Ing. Jozef Draškovič, aut. ing. - Šaľa

INVESTOR / DEVELOPER: Lindner Immobilien / Lindner Slovakia

DESCRIPTION: Administration building - 6 upper floors and 1 underground parking floor (parking 2600m², shops 1400 m² , stores 1050 m², offices 11600 m²) Separated parkinghouse – 1 underground floor and 4 upperfloors - totaly 6500 m² Contruction – monolithic concrete skeleton with diaphraghm walls, monolithic girderless slabs.

WORK EXTENT: Administration building – complete project documentation of bearing construktion, from the study to the realization project, author supervision Parkinghouse – project documentation of bearing construktion for obtaining of building permission.

projekt 1. detail 1. projekt 1. detail 2. projekt 1. detail 3. projekt 1. detail 4.
Galvani Business Center III

YEAR: 2006 - 2007

LOCALIZATION: Galvaniho ul., Bratislava

ARCHITECT: Ing. Jozef Draškovič, aut. ing. - Ing. Arch. M. Taldík - Šaľa

INVESTOR / DEVELOPER: Galvaniho 3 s.r.o. Bratislava

DESCRIPTION: Complex of administration buildings with 6 upper floors and 1 underground storey (parking 8600m², shops and stores 4100 m², offices 17000 m²) Contruction – 3 dilatation blocks, monolithic concrete skeleton with diaphraghm walls, monolithic girderless slabs.

WORK EXTENT: Complete project documentation of bearing construktion, from from the study to the realization project, author supervision

projekt 2. detail 1. projekt 2. detail 1. projekt 2. detail 1. projekt 2. detail 1.
Galvani Business Center IV

YEAR: 2007 - 2008

LOCALIZATION: Galvaniho ul., Bratislava

ARCHITECT: Ing. Jozef Draškovič, aut. ing. - Ing. arch. M. Taldík - Šaľa

INVESTOR / DEVELOPER: Galvaniho 4 s.r.o. Bratislava

DESCRIPTION: Complex of administration multistorey building with 7 upper floors and extended two-level underground parking (parking 12400m², shops and stores 4800 m², offices 30500 m²). Contruction – 4 dilatation blocks, monolithic concrete skeleton with diaphraghm and carrying walls, monolithic girderless slabs. Beyond the overground part plus 2 dilatation blocks of underground garages – mushroom construction.

WORK EXTENT: Complete project documentation of bearing construktion, from the study to the realization project, author supervision

projekt 3. detail 1. projekt 3. detail 1. projekt 3. detail 1. projekt 3. detail 1.
Mountain hotel

YEAR: 2007 - 2008

LOCALIZATION: Krahule

ARCHITECT: Ing. Jozef Draškovič, aut. ing. - Šaĺa

INVESTOR / DEVELOPER: A3 Media s.r.o. Bratislava

DESCRIPTION: Mountain hotel in an recreation resort with a complicated ground plan. Contruction – monolithic spread footing, brick walls, monolithic concrete columns and pillars, monolithic concrete slabs and girders, wooden framework of combined roof construction.

WORK EXTENT : Complete project documentation of bearing construktion.

Town villa

YEAR: 2007

LOCALIZATION: Vlčkova ul., Bratislava

ARCHITECT: CUUBUUS Engineering s.r.o. Bratislava
Akad. arch. R. Kopecký, Ing. M. Kopecký

INVESTOR / DEVELOPER: CUUBUUS Engineering s.r.o. Bratislava

DESCRIPTION: 4-storey villa in an extremely demanding steep land and difficult geological conditions, securing foundation pit and slope stability with micropiles (VUIS Foundation). Construction – monolithic concrete walls, columns and slabs, in the last floor steel columns.

WORK EXTENT: Complete project documentation of bearing construktion.

projekt 6. pohlad. projekt 6. stavba projekt 6. stavba
Astoria Palace I

YEAR: 2006

LOCALIZATION: Bratislava, Hodžovo nám.

ARCHITECT: B.K.P.Š s.r.o., Bratislava,
Akad. arch. E. Šutek, Ing. arch. A.Šutek

INVESTOR / DEVELOPER: IPR SLOVAKIA s.r.o., Bratislava

DESCRIPTION: Polyfunctional complex, mostly administrative and shopping parts, 7 upper floors, 3 underground floors for the parking places. Building with complicated ground plan situated in space demanding conditions of Old Town with complications – it is directly connect with exiting subway for pedestrians; there is existing infrastructure (electricity, piping’s regarding gas, water, heating etc.); so complicated situation for the site facilities and site traffic organization and all next problems connect with the realization process. Bearing constructions are monolithic, inside columns and walls are reinforced concert, prefabricated components at out side facade - as a exterior supports, monolithic reinforced slabs with girlands and heads, skew outside steel columns on the six’s floor, roof covered by the arched wooden and pasted girders..

WORK EXTENT: Project documentation of bearing construktion for realization including changes and author supervision.

projekt 8. detail 1. projekt 8. detail 2. projekt 8. detail 3. projekt 8. detail 4. projekt 8. detail 5. projekt 8. detail 6.
Reconstruction of a historical building

YEAR: 2005 - 2006

ARCHITECT: A4 Architecture, Bratislava
Ing. arch. T. Pavelka, Ing. arch. T. Pronay

LOCALIZATION: Kapitulská ul. 19, Trnava

INVESTOR/DEVELOPER: Immo Bank s.r.o. Bratislava

DESCRIPTION: Reconstruction of a historical building in center of Trnava.

WORK EXTENT: Complete project documentation of bearing construktion, author supervision and consulting during realisation.

projekt 10. detail 1. projekt 10. detail 2. projekt 10. detail 3. projekt 10. detail 4. projekt 10. detail 5. projekt 10. detail 6.
Building adaptation

YEAR: 2002-2005

LOCALIZATION: Štefánikova ul. 6 a 6A, Bratislava

ARCHITECT: P-T s.r.o. Bratislava
Ing. arch. Juraj Hermann a kol.

INVESTOR/DEVELOPER: T.A.P. International s.r.o.,
Merius a.s. Bratislava

DESCRIPTION: Two objects:

  1. Adaptation of a residential building with 2 upperfloors, construction of two-level attic, new courtyard extention and underground garage space.
  2. Adaptation of a building with 2 above ground storeys and a half-countersunk basement, superstructure of the 1st floor and construction of the attic.

WORK EXTENT: Complete project documentation of bearing construktion including work drawings of steel roof framework.

projekt 11. detail 1. projekt 11. detail 2. projekt 11. detail 3. projekt 11. detail 4. projekt 11. detail 5. projekt 11. detail 6. projekt 11. detail 7. projekt 11. detail 8.
OLO – Steel hall

YEAR: 2006

LOCALIZATION: Areál OLO a.s., Bratislava - Vlčie hrdlo

ARCHITECT: Ing. Jozef Draškovič, aut. ing. - Šaľa

DESCRIPTION: Functional steel hall for paper and PET bottles separation including auxiliary structures and shelters for technological equipment.

WORK EXTENT: Project documentation of bearing construktion for obtaining the building permission and for realisation.